Saturday, June 12, 2010

Week 9


1) Checked the oxygen level as well as the lower explosive limit in the steam turbine condenser man hole.

2) Assisted the inspection performed on the the erosion level of the Low Pressure (LP) side of the Steam Turbine's interior metal surface.

3) Assisted the field technician for the daily power station reading measurement round.

4) Carried out the weekly test on the Black Start Diesel Generator and the Emergency Diesel Generator where both were start up and synchronized from the central control room.

Week 8


1) Performed normalization of the main steam line and feedwater pump valves. The purpose was to carry out N2 preservation and wet preservation of the HP drum 11 and 12 as well as the feeedwater tank.

2) Fire Fighting weekly test was carried out. At the same time the fire fighting pump performance test for the diesel and the electrical pump was carried out.

3) Performed an inspection on the Generator Forced Cooling System (MPR) Plate Heat Exchangers. The port filters of the heat exchangers were removed and cleaned. This was done to improve the efficiency of the heat exchanger.