1) Checked the oxygen level as well as the lower explosive limit in the steam turbine condenser man hole.

2) Assisted the inspection performed on the the erosion level of the Low Pressure (LP) side of the Steam Turbine's interior metal surface.

3) Assisted the field technician for the daily power station reading measurement round.

4) Carried out the weekly test on the Black Start Diesel Generator and the Emergency Diesel Generator where both were start up and synchronized from the central control room.