Thursday, May 20, 2010

Week 4



1) Gas Turbine 12 (GT12) start-up was performed. Condensate level of the steam turbine is also monitored after the Heat Recovery Steam Generator (HRSG) is put into operation to complete the combined cycle mode.

2) Read the Operations & Maintenance Manual on the Fixed Water System (SGC).

3) Prepared Power Point presentation slides on the Fire Fighting Spray Deluge System Pressure Monitoring. The objective is to determine the factors that influence the system pressure.

4) Assisted the data entry of the Hazard Identification Risk Assessment & Risk Control (HIRARC) into the computer system.

5) Assisted the technician for daily power plant reading measurements round.

6) Refueled diesel into the Black Start Diesel Generator and the Emergency Diesel Generator.

7) Recorded the Air Intake Differential Pressure for GT11 & GT12 at the filter house. This is done to ensure that the filter cleanliness is optimum.